Difference between revisions of "September 4"
Jump to navigation
Jump to search
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
− | {{date}} | + | {{date|September 3|September 5}} |
+ | |||
+ | ==Events== | ||
+ | *[[2007]] – [[ECUA]] receives a major permit required to begin building the [[Central Water Reclamation Facility]] to replace the [[Main Street Wastewater Treatment Plant|Main Street plant]]. | ||
==Births== | ==Births== | ||
+ | *[[1866]] – [[W. L. Moyer]] | ||
*[[1940]] – [[Mike Wiggins]] | *[[1940]] – [[Mike Wiggins]] | ||
Latest revision as of 11:59, 4 September 2009
Events[edit]
- 2007 – ECUA receives a major permit required to begin building the Central Water Reclamation Facility to replace the Main Street plant.