Editing Brent Building
Jump to navigation
Jump to search
Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.
The edit can be undone.
Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 4: | Line 4: | ||
|name=Brent Building | |name=Brent Building | ||
|location=17 [[Palafox Place]] | |location=17 [[Palafox Place]] | ||
− | |architect=[[ | + | |architect=[[Hidgen Hawley]] |
|client=[[Francis Celestino Brent]] | |client=[[Francis Celestino Brent]] | ||
|engineer=[[M. T. Lewman]] | |engineer=[[M. T. Lewman]] | ||
Line 22: | Line 22: | ||
==Construction== | ==Construction== | ||
[[Image:BrentBuilding1905.jpg|thumb|right|300px|Hawley's 1905 rendering of the Brent Building]] | [[Image:BrentBuilding1905.jpg|thumb|right|300px|Hawley's 1905 rendering of the Brent Building]] | ||
− | Within weeks of the [[Halloween Night Fire]], Brent had commissioned renderings from architect [[ | + | Within weeks of the [[Halloween Night Fire]], Brent had commissioned renderings from architect [[Hidgen Hawley]]. [[M. T. Lewman]] was hired as the general contractor. Work progressed quickly, and a [[March 25]], [[1906]] article in the ''[[Pensacola Journal]]'' predicted the building would be ready for lease by May. In fact, Brent received the keys on [[July 30]], and an open house was held on [[August 1]]. |
A newspaper article described the completed building in detail: | A newspaper article described the completed building in detail: | ||
Line 30: | Line 30: | ||
==Current tenants== | ==Current tenants== | ||
+ | :''(Incomplete list)'' | ||
*[[Global Grill]] | *[[Global Grill]] | ||
*[[Blondie's]] | *[[Blondie's]] |